The List of the projects provided below is not intended to be comprehensive, but rather to emphasize the diversity of work, which has been undertaken by Global Hi-Tech (List-A) and which has been undertaken by key / core team personnel’s prior to joining the present Global Hi-Tech (List-B).

Activities:
Feasibility& Survey: FS
Project Management: PM
Detailed Design: DD
Proposal / Proc.Support: PS
Construction Supervision: CS

Lists

List A

Sr#

Project Description

Year

Activities

Remarks

 BUILDING SERVICES

01

Revamping THQ Hospital Kallur Kot - Bhakkar

2017

FS, PM, DD, PS

Work includes Architecture, Civil & Structure

and MEP Design.

02

Revamping THQ Hospital Mankera - Bhakkar

2017

FS, PM, DD, PS

Same as above

03

Revamping THQ Hospital Khushab - Khushab

2017

FS, PM, DD, PS

Same as above

04

Revamping THQ Hospital Bhalwal - Sargodha

2017

FS, PM, DD, PS

Same as above

05

Revamping THQ Hospital Shahpur- Sargodha

2017

FS, PM, DD, PS

Same as above

06

Revamping THQ Hospital Fort Monroe - DG Khan

2017

FS, PM, DD, PS

Same as above

07

Revamping THQ Hospital Karor - Layyah

2017

FS, PM, DD, PS

Same as above

08

Revamping THQ Hospital Thal (Mian Nawaz Sharif Hospital) Layyah - Layyah

2017

FS, PM, DD, PS

Same as above

09

Revamping THQ Hospital Alipur - Muzaffargarh

2017

FS, PM, DD, PS

Same as above

10

Revamping THQ Hospital Rojhan - Rajanpur

2017

FS, PM, DD, PS

Same as above

11

Dar-Arqam School Main Campus, Khushab

2016

FS, PM, DD, PS

Work includes Architecture, Civil & Structure

and MEP Design.

12

Burj Ismail Commercial Building, Sargodha

2017

DD, PS, CS

HVAC & Plumbing Design

13

Mega Brand Commercial Outlet, Lahore

2016

FS, PM, DD, CS

Architectural & Interior Design

14

Mueller & Phips Commercial Outlet, Lahore

2017

FS, PM, DD, PS

Architectural & Interior Design

15

 Shakland developers Head Office, Lahore

2017

FS, PM, DD, CS

Architectural & Interior Design

OIL & GAS

01

Material Estimation – Fire Fighting System Replacement at Al-Khafji Onshore Facilities.

2017

PS

Civil / Structural MTO’s have been prepared for EPC Proposal.

02

Electrical / Instr. Material Estimation Works for:

1. Phase-2, Bir Seba Field Development Project (Hassi Messaoud, Sahara Desert, Algiers.

2. Santos Roma Gas Field Development Project.

3. Sarsang Block - Wellsite-based production facility (WPF) - Kurdistan Iraq.

4.

5.

2017

PS

Complete Electrical / Instrumentations / Telecom Systems Material Estimation services have been provided for the submission of EPC Proposal.

RFQs have also developed for getting quotations from various vendors.

 PROJECT MANAGEMENT

01

Head office Renovation Works – Haier Pakistan

2017

PS,CS

Architecture, Civil / Structure and MEP teams have been mobilized for the site supervision.

List B

BUILDING SERVICES

01

Upgradation of DHQ Hospital Sialkot to Teaching Hospital with total area of around 830,000 sq-ft.

2017

FS, PM, DD, PS

Detailed Design including Architectural, Structural, HVAC, Electrical, Public Health Engineering, Fire Fighting & Medical gases systems for Upgradation along with Tender Documents / Cost Estimates Preparation.

02

Punjab Agriculture, Food & Drugs Authority

(PAFDA) Labs Projects with total area of around 200,000 sq-ft.

2017

FS, PM, DD, PS

Detailed Design including Architectural, Structural, HVAC, Electrical, Public Health Engineering, Fire Fighting & Medical gases systems for Upgradation along with Tender Documents / Cost Estimates Preparation.

03

Shaybah Residential Complex Project

PM, DD, PS

Shaybah expansion includes detailed engineering for the construction of three (3) new Residential Buildings complete with new HVAC, electrical & wiring, sewer & drainage, communication & cable television and firefighting & alarm systems. Also expansion of the existing utilities (Power, Fire / Potable Water, Communications, Sewerage Treatment) to cater for the new buildings.

04

 Specialized Medical Centre, Dammam, KSA

2016

DD

Detailed HVAC, Public Health & Medical gases system design.

05

 Pediatric Hospital, Riyadh, KSA

2016

DD

Detailed HVAC, Public Health & Medical gases system design.

06

 Saudi Food & Drug Authority HQ, Jeddah, KSA

2016

DD

Detailed HVAC, Public Health & Medical gases system design.

07

 Ummul Qurrah University, Mecca, KSA

2016

DD

Detailed HVAC, Public Health & Medical gases system design.

08

 King Fahad Hospital, KSA

2017

DD

Detailed HVAC, Public Health & Medical gases system design.

09

 PINS Hospital, Lahore, Pakistan

2012

DD

Detailed HVAC system design.

10

 LGH Hospital-Phase 3, Pakistan

2012

DD

Detailed HVAC system design.

11

PepsiCo Lays Factory, Lahore

2012

DD

Detailed HVAC system design.

POWER & ENERGY

01

Design / Construction of Transmission Line / Substation Extension Projects:

Fadhili Gas Plant.

2016

PM, DD, PS

Tendering, Engineering design and Procurement Services.

02

Design / Construction of Transmission Line / Substation Extension of:

Cogeneration interconnection facilities at Hawiya Gas Plant.

2016

PM, DD, PS

Tendering, Engineering design and Procurement Services.

03

Design / Construction of Transmission Line / Substation Extension of:

69kV D/C in SAOO Up gradation project at Abqaiq with Saudi Aramco.

2016

PM, DD, PS

Tendering, Engineering design and Procurement Services.

04

Design / Construction of Transmission Line / Substation Extension of:

OHTL 115 kV from Berri to Juaymmah Plant.

PM, DD, PS

Tendering, Engineering design and Procurement Services.

05

Sharourah 50MW Power Plant Project

PM, DD, PS

Sharourah PP Saudi Arabia, with main scope of design/ engineering for BOP (Balance of Plant) including process, electrical & instrumentation, civil & structure, piping and mechanical design packages for the power plant.

06

Power System Study for Berri Gas Cogeneration

DD

Power System Studies including Load Flow,

Short Circuit, Motor Starting, Transient Stability & Relay Coordination were performed on ETAP.

07

Consultancy for 500KV Moro Rahim Yar Khan / Jamshoro & Dadu Substations.

DD

Preparation of Proposals, Bid Evaluations, Design Review Services for Moro & Rahim Yar Khan 500 kV Substations & installation of 220/132 kV Auto-transformers at Dadu and Jamshoro Substations.

08

PP-14 Power Plant, Riyadh, KSA

2016

DD

Detailed HVAC & Plumbing design.

09

PP-13 Power Plant, Riyadh, KSA

2015

DD

Detailed HVAC & Plumbing design.

10

PP-10 Power Plant, Riyadh, KSA

2015

PM, CS

 HVAC, Fire Fighting & Plumbing Field Engineering and construction supervision.

11

Qurayyah Power Plant, KSA

2013

PM, CS

 HVAC, Fire Fighting & Plumbing Field Engineering and construction supervision.

 OIL & GAS

01

Cogeneration Power Plants Interconnection facilities at Ras Tanura Refinery & Juaymah Plant

2015

PM, DD, PS

Feed & detailed design packages including all discipline (process, electrical & instrumentation, civil& structure, piping and mechanical) were developed for both plants. The projects provided the interconnection facilities to facilitate 3rd Party cogeneration trains for the supply of power and steam for the plants.

02

LPG Expansion Project at Yanbu Refinery

PM, DD, PS

The purpose of this project is to support Saudi Aramco corporate objective to efficiently meet the Kingdom’s demand for LPG. Feed package including all discipline (process, electrical & instrumentation, civil / structure piping, mechanical) was developed to upgrade the existing LPG facilities at Yanbu Refinery (YR) and Yanbu NGL (YNGL).

Global Hi-Tech Engineering Consultant’s (Pvt.) Ltd In-Hand Projects

The List of the projects provided below is not intended to be comprehensive, but rather to emphasize the diversity of work, which has been undertaken by Global Hi-Tech.

Sr#

Project

Client

Project Description

01

Us & Dynamo Textile Mill-Pakistan

Private

Detailed Design of Civil structure, Process piping HVAC, firefighting & plumbing

02

STC Central Warehouse, KSA

Private

Complete MEP Design.

03

Saudi Aramco Land Rigs Manufacturing Facility, KSA

Private

Complete MEP design for the project comprising of various buildings including workshops, warehouse & main office block with an approximate covered area of 500,000 sq. ft.

04

Aasia Allied Steel, Al Jubail, KSA

Private

Complete MEP design services for various auxiliary buildings with total estimated cooling capacity of 500 Tons.

05

Lukoil Substation Project, Iraq

Private

Complete MEP Design of substation located in Lukoil Facility Iraq.

06

Fauji Food Cheese Processing Plant Bhalwal

FAUJI Foods (Pvt) Limited

Deatiled HVAC and electrical system desgin of cheese proceesing and packaging plant

07

132kV Substation Palm View Housing Scheme, Gujranwala

Aujla & Associates, Gujranwala, Pakistan

Complete substation design covering electrical & protection systems, HVAC and plumbing systems along with cost estimation and tendering support services for the Client.

08

500 Bed Nishtar-II Hospital - Multan

Infrastructure Development Authority, Punjab (IDAP)

Detailed Design of HVAC, firefighting, plumbing and complete External electrical power systems.

09

200 Bed Mother & Child Care Hospital - Mianwali

Infrastructure Development Authority, Punjab (IDAP)

Detailed Design of HVAC, firefighting, plumbing and complete External electrical power systems.

10

150 Bed Cardic Hospital – DG Khan

Infrastructure Development Authority, Punjab (IDAP)

Detailed Design of Civil structure, HVAC, firefighting, plumbing and complete External electrical power systems.

11

Evercare Hospital Lahore

Private

HVAC System Rectification & Upgrade.